Ion Cyclotron Heating Transmission Lines
The ITER Organization is responsible for installing the ion cyclotron transmission lines (12%).
The ITER Organization is responsible for installing the ion cyclotron transmission lines (12%).
The US is responsible for 88% of the electron cyclotron transmission lines, including research and development (with Oak Ridge National Laboratory and Massachusetts Institute of Technology), design, fabrication, and interfaces. The IO is responsible for installing the electron cyclotron transmission lines (12%).